Process Improvement & Cost Control

Scrap, PPM and throughput, moved in months, not years.

Proven track record

Results, not slides.

Global OEM · India6–12 months

Supplier Trouble Shooting

Interior plastic parts

A supplier's interior plastic parts were failing at scrap and PPM levels that put line supply at risk.

Scrap and PPM brought down to series level, the sign-off cycle cut to days, and a process left running robustly under VW Formel Q and ISO/TS 16949.

  • Deviation release secured for local material
  • Production sign-off cycle compressed
  • Robust processes per VW Formel Q and ISO/TS 16949
Global OEM · India7 months

Supplier Development

OEM central quality (K-QS) / India QA

Two new local production lines had to be stood up from greenfield and reach the OEM's own quality bar in seven months.

Both greenfield lines reached start of production on quality, with first-sample and design approval passed and audit-ready processes handed over.

  • Greenfield: two plants/lines built (interior/exterior injection moulding + automatic painting)
  • OEM–supplier interface created and run
Global OEM · India12 months

Supplier Qualification

Local supplier base build-out

No scaled local supplier-quality function existed, exposing the lines to disruptions and field complaints.

A qualified local supplier base and a running in-house supplier-quality team; line disruptions and field complaints brought to a stop.

  • Internal Supplier Quality (SQ) team established and running
Global OEM · India8 months

Interim Supply Chain Management

Polymer / headliner

Headliner supply readiness was flagged red before two model-series launches, with daily air freight masking an unstable chain.

Launch and build secured for two model series without a line stop; the air-freight dependency ended and supplier readiness de-escalated.

  • Secured launch and build of two model series
Durchsetzungsvermögen und Überzeugungskraft geprägt mit einem fundamentalen, fachlichen Background sowie einer systematisch, analytischen Denkweise haben das Projekt für VW erfolgreich werden lassen.

Thomas EngelGM Purchase New Launches, VW India Pvt. Ltd.